All development projects at the port are being undertaken in private sector on BOT basis without costing a penny to PQA. Foreign Direct Investment (FDI) to the tune of US$ 1.22 billion this year through development projects at the port.

Port Development Status

Following are some of the projects that have been part of the port development over the past few decades. Each project has been planned and executed with consideration of every minute detail and best outcome quality as the top priority.

2nd Container Terminal

Implementation Agreement was signed on 17th August 2006 with QICT...

Grain & Fertilizer Terminal

A specialized Grain & Fertilizer Terminal developed by M/s Fauji Akbar Portia at...

Liquid Cargo terminal (LCT)

The terminal with design capacity of 4 million tonnes per annum has been developed...

GasPort LNG Floating Terminal

To meet the energy demands, an LNG Floating Terminal ...


KNOW MORE ABOUT

MAJOR INDUSTRIAL & COMMERCIAL PROJECTS


Some of the major Industrial and Commercial Projects developed at PQA are :

KESC Thermal Power Plant

The plant spread over an area 223 acres of land with 1260 MW power generation capacity has been developed at a cost of Rs.1.4 billion and is operational since 1984.

Indus Motors Automobile Plant

Developed through joint venture between Toyota Compabny of Japan and House Habibis of Pakistan at a cost of US$100 million over an area of 105 acres of land, the plant is operational since 1993.

Engro Asahi Poymer Plant

The plant developed over an area of 30 acres of land at a cost of Rs.560 million to produce various types of Petrochemicals/Fertilizer is operational since 2002.

PPTA Plant

Operational since 1998 with designed capacity of 0.43 million tonnes of annual productions, the plant is spread over an area of 150 acres and has been completed at a cost of US$ 500 million.

Bin Qasim Fertilizer Plant

Developed by Fauji Foundation of Pakistan over an area of 350 acres of land at a cot of US$ 370 million, the plant is operational since 1998.

IFFCO Pakistan

The refinery is deveoped over an area of 15 acres at a cost of US$ 34 milion, integrated with its bulk oil terminal. It is operational since 1993 and has manufacturing capacity of 0.4 million tonnes per annum.

BOC Gases, UK

Established over an area of 10 acres of land, the plant has been developed at a cost of Rs.1.25 billion production hydrogen gas, nitrogen gas etc. The plant is operational since 1998.

Engro Chemicals (NPK |Plant)

The facility has been developed over an area of 30 acres of land at a cost of US$ 81 million to produce fertilizers of various types and has been operational since 1999.

Mapak Edible Oil Refinery

The refinery has been developed at Port Qasim through joint ventyre of Malaysia and |Pakistan with a refining capacity of around 0.4 million tonnes per annum at a cost of US$ 20 million. The plant was commissioned in 2006.